CERC approved Detailed procedure for Relieving Congestion in Real Time Operation
National Load Despatch Centre (NLDC) has been constituted
as per Ministry of Power
(MOP) notification ,New Delhi dated 2nd March 2005 and
is the apex body to ensure
integrated operation of the national power system.
The main functions
assigned to NLDC are:
Supervision Over the Regional Load Despatch Centres.
Scheduling and dispatch of electricity over the inter-regional
links in accordance with grid standards specified by the authority and grid code
specified by Central Commission in coordination with Regional Load Despatch Centres.
Coordination with Regional Load Despatch Centres for achieving
maximum economy and efficiency in the operation of National Grid.
Monitoring of operations and grid security of the National
Grid.
Supervision and control over the inter-regional links as
may be required for ensuring stability of the power system under its control.
Coordination with Regional Power Committees for regional
outage schedule in the national perspective to ensure optimal utilization of power resources.
Coordination with
Regional Load Despatch Centres for the energy accounting of inter-regional exchange of power.
Coordination for restoration of synchronous operation of national grid with Regional
Load Despatch
Centres.
Coordination for trans-national exchange of power.
Providing Operational feedback for national grid planning to the Authority and Central
Transmission Utility.
Levy and collection of such fee and charges from the generating companies or licensees
involved in the power system, as may be specified by the Central Commission.
Dissemination Of information relating to operations of transmission system in accordance with
directions or regulations issued by Central Government from time to time.
|
|
|
Reliability,
Security and Economy in Power Transmission |